Planning extraction – strip roads and work organisation
ZT Forest Market
How to lay out strip roads, landings and the order of work so the harvester and forwarder work efficiently and without damage.
Good extraction planning can boost forwarder productivity more than swapping it for a newer machine. The key is a plan prepared before entering the stand.
Strip roads
- Spacing depends on the harvester's crane reach – strip roads are typically laid out about 20 m apart, so the crane reaches half the distance between them.
- Keep strip roads as straight as possible and along the slope, avoiding wet spots and valuable trees.
- Mark the strip roads on site before felling starts.
Landings
- Place them next to roads suitable for timber trucks.
- Provide space for separate piles for each assortment.
- Avoid piling on ditches and culverts.
Harvester and forwarder working together
- The harvester places assortments in piles on one side of the strip road, with the butt ends facing the same way.
- Branches go onto the strip road – forming a mat that protects the soil.
- The forwarder starts when the harvester has built up enough stock – so neither machine waits.
- The forwarder collects one assortment at a time where possible – it speeds up unloading.
Machine data
Harvester production reports (e.g. in the StanForD standard) let you estimate volume along each strip road and plan the number of trips. More in our article on measuring systems.
Looking for a forwarder? See e.g. the Komatsu 895 or Ponsse Buffalo.